{"id":118987,"date":"2018-04-18T23:59:36","date_gmt":"2018-04-18T18:29:36","guid":{"rendered":"http:\/\/globalpress.hinduismnow.org\/?p=118987"},"modified":"2018-04-18T23:59:36","modified_gmt":"2018-04-18T18:29:36","slug":"rs-200-crore-revamp-to-make-roads-in-allahabad-kumbh-ready-times-of-india","status":"publish","type":"post","link":"https:\/\/globalpress-new.hinduismnow.org\/?p=118987","title":{"rendered":"Rs 200-crore revamp to make roads in Allahabad Kumbh-ready | Times of India"},"content":{"rendered":"<p>ALLAHABAD: The state government has allocated a corpus of Rs 200 crore for giving Allahbad\u2019s maujor streets and crossings a a makeover ahead of the Kumbh-2019.<\/p>\n<p>The Allahabad Development Authority (ADA) has already started the work of widening roads on more than 15 streets which include\u00a0Stanley\u00a0road (Allahabad-Lucknow highway), Lukerganj-Kaushambi turn (Kaushambi Road), Johnstonganj-South Malaka Road, South Malaka-\u2013Rambagh trisection, the road between Rambagh trisection and GT\u00a0Jawahar crossing, Daradanj-Dashashwamesh Ghat road,\u00a0GT Jawahar\u00a0Crossing\u2013Balson Crossing, CMP Dott Bridge\u2013Baihrana Crossing, Nawab Yusuf Road, Kasturba Gandhi Road, MG road (Tulsi crossing-\u2013Harshwardhan Crossing) ,Noorullah road, and the Old GT road. The road repiar would enusre smooth traffic flow for commuters.<\/p>\n<p>Vice-chairman of ADA Bhanu Chandra Goswami said, \u201cApart from widening of roads work of streets, we would also install LED-fitted street lights and revamp 30 important traffic junctions. Around Rs 200 crore would be spent for the project.\u201d<\/p>\n<p>Goswami added \u201cThe department has set October 2018 as deadline to complete all the projects of widening and beautification. ADA would also widen the roads between\u00a0Jhunsi Railway Station\u00a0and the\u00a0Prayag Railway Station.\u201d<\/p>\n","protected":false},"excerpt":{"rendered":"<p>ALLAHABAD: The state government has allocated a corpus of Rs 200 crore for giving Allahbad\u2019s maujor streets and crossings a a makeover ahead of the Kumbh-2019. The Allahabad Development Authority (ADA) has already started the work of widening roads on more than 15 streets which include\u00a0Stanley\u00a0road (Allahabad-Lucknow highway), Lukerganj-Kaushambi turn (Kaushambi Road), Johnstonganj-South Malaka Road, [&hellip;]<\/p>\n","protected":false},"author":19,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":""},"categories":[18],"tags":[],"_links":{"self":[{"href":"https:\/\/globalpress-new.hinduismnow.org\/index.php?rest_route=\/wp\/v2\/posts\/118987"}],"collection":[{"href":"https:\/\/globalpress-new.hinduismnow.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/globalpress-new.hinduismnow.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/globalpress-new.hinduismnow.org\/index.php?rest_route=\/wp\/v2\/users\/19"}],"replies":[{"embeddable":true,"href":"https:\/\/globalpress-new.hinduismnow.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=118987"}],"version-history":[{"count":0,"href":"https:\/\/globalpress-new.hinduismnow.org\/index.php?rest_route=\/wp\/v2\/posts\/118987\/revisions"}],"wp:attachment":[{"href":"https:\/\/globalpress-new.hinduismnow.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=118987"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/globalpress-new.hinduismnow.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=118987"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/globalpress-new.hinduismnow.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=118987"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}