Temple compound broken to widen the road | Times of India
Mar 5, 2017

VADODARA: The dismantling of the gate and compound wall of the Wadi Swaminarayan Temple began on Saturday. The temple functionaries decided to do so in wake of the Vadodara Municipal Corporation (VMC) taking up widening of the road opposite the temple.
VMC had conducted an extensive razing drive along the Harankhana Road that connects Panigate to Gajrawadi. The gate of the temple was falling in the way. Temple authorities had obtained a stay against its razing when the road line was to be cleared in 1987.
After discussion, it was decided to bring down the gate and other religious structures on the road. A meeting in this regard was held at VMC headquarters on Friday evening. The process to raze the wall began on Saturday morning.
The Swaminarayan temple is located in the heart of the city. Work on the temple was completed 140 years back and it is believed that the ‘dela’ or gate came up around the same time as the temple.

Tags:

0 Comments

Submit a Comment

Your email address will not be published. Required fields are marked *